{"id":275,"date":"2025-07-01T14:12:19","date_gmt":"2025-07-01T14:12:19","guid":{"rendered":"https:\/\/trevistg.wpenginepowered.com\/en\/progetti\/chacao-bridge-project\/"},"modified":"2025-07-16T12:32:22","modified_gmt":"2025-07-16T12:32:22","slug":"chacao-bridge-project","status":"publish","type":"progetto","link":"https:\/\/trevispa.com\/en\/progetti\/chacao-bridge-project\/","title":{"rendered":"Chacao bridge project"},"content":{"rendered":"\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h2 class=\"wp-block-heading has-text-align-center has-primary-color has-text-color has-link-color wp-elements-5e4366225725b61c54f456af287d636e\">Los Lagos Region, Chile<\/h2>\n\n\n\n<p class=\"has-text-align-center\">The construction of the&nbsp;<strong>Chacao Bridge<\/strong>&nbsp;aims at connecting&nbsp;the continent with Chilo\u00e9 Island, located 1.100km south of Santiago de Chile, in the Los Lagos Region, 48km away from Puerto Montt and only 5km away from Pargua.&nbsp;<br>In 2012 and 2013, the project was consolidated through the traditional fiscalpublic construction system, with the creation of an international bid registration. In December 2013, the contract was awarded to the Consorcio Puente Chacao (Chacao Bridge Joint Venture), an entity formed by four international companies headed by the Korean Hyundai.<br>Three years later, the design of the Chacao Bridge was recognized with the \u201cBe Inspired\u201d award in the category \u201cBridges Innovations,\u201d which consolidated these MOP Roads Direction\u2019s initiative as an \u201cavant-garde\u201d project worldwide.<\/p>\n\n\n\n<p class=\"has-text-align-center\"><strong>Route 5<\/strong>&nbsp;is the longest highway in Chile, stretching from Arica to Quell\u00f3n in Chilo\u00e9, hence connecting the country throughout a 3353 km long highway. However, when reaching the end, the road is interrupted&nbsp;between the continent and Chilo\u00e9 Island by the Chacao Channel, where all traffic runs, via a 30 to 45 minutes ferry trip. The bridge under construction will connect the missing part, expediting the main transportation to\/from Quell\u00f3n at the southern tip of Chilo\u00e9. Once the project has been completed, there will be no interruption between the continent and Chilo\u00e9 Island. The country will be permanently connected from Arica in the north of Chile to Quell\u00f3n in Chilo\u00e9 Island, through Route 5, which will be extended for 190 km. The bridge will cut the time required to cross the channel to just three minutes. This is a major improvement considering the actual trip time of about 30 to 45 minutes that the ferry takes to cross the channel, without taking into account the extreme weather conditions the channel faces throughout the seasons.<\/p>\n\n\n\n<p class=\"has-text-align-center\">The length of the bridge will be 2,574 m and will consist of three main pylons, one in the middle of the channel and two on each side, namely the North Pylon on the continent side and the South Pylon on the Chilo\u00e9\u2019 Island\u2019s. The span between the Central and North Pylons will stretch for 1,155 m,&nbsp;while the ones between the Central and South Pylons will cover a 1,055 m length, thus becoming&nbsp;<strong>the longest suspension bridge in South America<\/strong>.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group alignfull\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"saz-block-custom\">\n<section class=\"data-tab py-5 mt-5\">\n    <div class=\"container py-lg-4\">\n        <div class=\"row justify-content-center\">\n            <div class=\"col-lg-8\">\n                <div class=\"table-responsive\">\n                    <table class=\"table text-white\">\n                        <tbody>\n                                                            <tr>\n                                    <th scope=\"row\">Owner<\/th>\n                                    <td>Ministry of Public Works of Chile (MOP)<\/td>\n                                <\/tr>\n                                                            <tr>\n                                    <th scope=\"row\">Main Contractor\t<\/th>\n                                    <td>CPC (Consorcio Puente Chacao)<\/td>\n                                <\/tr>\n                                                            <tr>\n                                    <th scope=\"row\">Duration of work\t<\/th>\n                                    <td>2014 &#8211; on going<\/td>\n                                <\/tr>\n                                                    <\/tbody>\n                    <\/table>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/div>\n<\/section><\/div>\n\n<div class=\"saz-block-custom\">\n<section class=\"gallery-interna\" style=\"background: url(https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3734_n_02-scaled.jpeg) center center no-repeat #353535;background-size: cover;\">\n    <div class=\"bg-grey\"><\/div>\n    <div class=\"container\">\n        <div class=\"row justify-content-center\">\n            <div class=\"col-md-12 col-lg-10\">\n                <div id=\"carouselImmagini\" class=\"carousel slide\" data-ride=\"carousel\">\n\n                    <div class=\"carousel-inner\">\n                                                    <div class=\"carousel-item active\">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3734_n_02-scaled.jpeg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3734_n_02-scaled.jpeg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3735_n_03-scaled.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3735_n_03-scaled.jpg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3738_n_01-scaled.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3738_n_01-scaled.jpg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3739_n_IMG_0479.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3739_n_IMG_0479.jpg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3740_n_IMG_9994-scaled.jpeg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3740_n_IMG_9994-scaled.jpeg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3741_n_Area-1-scaled.jpeg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3741_n_Area-1-scaled.jpeg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3742_n_DJI_0693.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3742_n_DJI_0693.jpg\">\n                            <\/div>\n                                            <\/div>\n                    <a class=\"carousel-control-prev\" href=\"#carouselImmagini\" role=\"button\" data-slide=\"prev\">\n                        <span class=\"fas fa-chevron-left fa-lg text-primary\" aria-hidden=\"true\"><\/span>\n                        <span class=\"sr-only\">Previous<\/span>\n                    <\/a>\n\n                    <a class=\"carousel-control-next\" href=\"#carouselImmagini\" role=\"button\" data-slide=\"next\">\n                        <span class=\"fas fa-chevron-right fa-lg text-primary\" aria-hidden=\"true\"><\/span>\n                        <span class=\"sr-only\">Next<\/span>\n                    <\/a>\n                <\/div>\n\n            <\/div>\n        <\/div>\n    <\/div>\n<\/section><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h2 class=\"wp-block-heading has-text-align-center\"><strong>Project<\/strong><\/h2>\n\n\n\n<p class=\"has-text-align-center\"><strong>Trevi Chile SpA (Trevi), was selected by the consortium to carry out the foundation works of the bridge piles,&nbsp;<\/strong>including the Central Pylon (already completed), as well as the North and South Pylons, currently under construction. The foundation works of the Central Pylon consisted in the execution of 36 piles with 2.5 m wide diameters and lengths of 54 m for type one piles and 58 m for types 2 and 3 approximately, each of them excavated from a jack-up barge.<\/p>\n\n\n\n<p class=\"has-text-align-center\">Ocean currents were among the challenges Trevi had to face during the execution of the Central Pylon. They were about 528 cm\/s on the marine surface and 192 cm\/s on the sea bottom,&nbsp;caused by the ebb and flow of tidal streams. Moreover, weather<br>conditions were harsh, with strong winds ranging between 18 and 23 m\/s (65-83 km\/h), an average temperature of 11\u00b0C and torrential rains throughout the year, with an average precipitation of 2000 mm per year.<\/p>\n\n\n\n<p class=\"has-text-align-center\">Notwithstanding the above, the main technical challenge Trevi had to overcome was the size of the piles, along with the length, diameter and weight of the permanent steel casings and the reinforcement cages, which involved the use of heavy machinery in the limited space available on the jack-up barge. Therefore, logistics and project management as a whole were undoubtedly another great challenge. In addition to the casing installation, drilling works and concrete casting on the Central<br>Pylon, Trevi was in charge of the assembly of the reinforcement cages and the welding of steel casings.<\/p>\n\n\n\n<p class=\"has-text-align-center\">The works carried out for the Central Pylon were the following:<br><strong>36 piles with a 2500 mm width diameter and a 54m or 58 m length<\/strong>.<\/p>\n\n\n\n<p class=\"has-text-align-center\">Total volume of concrete cast on piles: 10,713 m3<\/p>\n\n\n\n<p class=\"has-text-align-center\">Steel rebar used for the reinforcement cages: 2,256 t<\/p>\n\n\n\n<p class=\"has-text-align-center\">Steel used for the steel casings: 3,447 t, and 24 m, 28 m length.<\/p>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Los Lagos Region, Chile<\/p>\n","protected":false},"featured_media":2536,"menu_order":60,"template":"","tipologia_progetto":[4],"class_list":["post-275","progetto","type-progetto","status-publish","has-post-thumbnail","hentry","tipologia_progetto-marine-works"],"acf":[],"_links":{"self":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/progetto\/275","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/progetto"}],"about":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/types\/progetto"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/media\/2536"}],"wp:attachment":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/media?parent=275"}],"wp:term":[{"taxonomy":"tipologia_progetto","embeddable":true,"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/tipologia_progetto?post=275"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}