{"id":300,"date":"2025-07-01T14:14:22","date_gmt":"2025-07-01T14:14:22","guid":{"rendered":"https:\/\/trevistg.wpenginepowered.com\/en\/progetti\/sabah-al-salem-university-project\/"},"modified":"2025-07-16T13:01:41","modified_gmt":"2025-07-16T13:01:41","slug":"sabah-al-salem-university-project","status":"publish","type":"progetto","link":"https:\/\/trevispa.com\/en\/progetti\/sabah-al-salem-university-project\/","title":{"rendered":"Sabah Al Salem University Project"},"content":{"rendered":"\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h2 class=\"wp-block-heading has-text-align-center has-primary-color has-text-color has-link-color wp-elements-f03d2ab0a7428398899f1d83b97e095f\">Kuwait City, Kuwait<\/h2>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\"><strong>Introduction<\/strong><\/h3>\n\n\n\n<p class=\"has-text-align-center\">Inspired by the world\u2019s premier institutions of higher education, the nation of Kuwait is in the midst of an ambitious plan to create a new, state-of-the-art campus for Kuwait University that provides residents with the most advanced educational facilities.<br>One vital piece of this learning center is the 325,000 sq.m College of Science.<br>In addition to integrating the most current and state-of-the art teaching tools and research equipment, the design had to be mindful of Kuwait\u2019s adherence to traditional religious guidelines.<br>This meant observing a policy of gender separation andwomen.<br>The programming for the men\u2019s and women\u2019s colleges is divided by zones and then connected together with common and shared circulation spaces.<br>A major east-west circulation spine called \u201cThe Galleria\u201d connects the College of Science to adjacent colleges. The north-south connector called \u201cThe Academic Galleria\u201d brings students from the parking and drop-off areas into the heart of the college.<br>The central areas within each building house the student activities center, multiple large auditoriums, and the Student Learning Resource Center &#8211; a multi-story space for students to congregate.<br>The new College of Science will include the following&nbsp;departments: mathematics, computer science, chemistry, physics, applied physics, zoology, botany, microbiology, biochemistry, molecular biology, geology, desert sciences, marine sciences, statistics, applied statistics, radiation safety, and biotechnology.<\/p>\n\n\n\n<p class=\"has-text-align-center\">Construction, operation &amp; maintenance of BID PACK 5C: Medical campus, ring roads and bridges works<br>The Sabah Al Salem University Project in Al Shadadiyah is based on an approximate area of 6,000,000 sqm and will deliver a complete \u201cUniversity City\u201d development for campus education buildings and all their related support facilities.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group alignfull\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"saz-block-custom\">\n<section class=\"data-tab py-5 mt-5\">\n    <div class=\"container py-lg-4\">\n        <div class=\"row justify-content-center\">\n            <div class=\"col-lg-8\">\n                <div class=\"table-responsive\">\n                    <table class=\"table text-white\">\n                        <tbody>\n                                                            <tr>\n                                    <th scope=\"row\">Owner<\/th>\n                                    <td>KUWAIT UNIVERSITY<\/td>\n                                <\/tr>\n                                                            <tr>\n                                    <th scope=\"row\">Main Contractor\t<\/th>\n                                    <td>Mohamed Abdulmohsin Al-Kharafi &amp; Sons W.L.L<\/td>\n                                <\/tr>\n                                                            <tr>\n                                    <th scope=\"row\">Duration of works:\t<\/th>\n                                    <td>2019-2020<\/td>\n                                <\/tr>\n                                                    <\/tbody>\n                    <\/table>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/div>\n<\/section><\/div>\n\n<div class=\"saz-block-custom\">\n<section class=\"gallery-interna\" style=\"background: url(https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3946_n_Immagine_22.jpg) center center no-repeat #353535;background-size: cover;\">\n    <div class=\"bg-grey\"><\/div>\n    <div class=\"container\">\n        <div class=\"row justify-content-center\">\n            <div class=\"col-md-12 col-lg-10\">\n                <div id=\"carouselImmagini\" class=\"carousel slide\" data-ride=\"carousel\">\n\n                    <div class=\"carousel-inner\">\n                                                    <div class=\"carousel-item active\">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3946_n_Immagine_22.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3946_n_Immagine_22.jpg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3947_n_ref644.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3947_n_ref644.jpg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3948_n_ref64465.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3948_n_ref64465.jpg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3949_n_ref644656.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/3949_n_ref644656.jpg\">\n                            <\/div>\n                                            <\/div>\n                    <a class=\"carousel-control-prev\" href=\"#carouselImmagini\" role=\"button\" data-slide=\"prev\">\n                        <span class=\"fas fa-chevron-left fa-lg text-primary\" aria-hidden=\"true\"><\/span>\n                        <span class=\"sr-only\">Previous<\/span>\n                    <\/a>\n\n                    <a class=\"carousel-control-next\" href=\"#carouselImmagini\" role=\"button\" data-slide=\"next\">\n                        <span class=\"fas fa-chevron-right fa-lg text-primary\" aria-hidden=\"true\"><\/span>\n                        <span class=\"sr-only\">Next<\/span>\n                    <\/a>\n                <\/div>\n\n            <\/div>\n        <\/div>\n    <\/div>\n<\/section><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h2 class=\"wp-block-heading has-text-align-center\"><strong>Project<\/strong><\/h2>\n\n\n\n<p class=\"has-text-align-center\">The project consists of developing the infrastructure for the main Campus, and construction of infrastructure, builings for Medical campus and developing Roundabouts and Signage works.<br><strong>Trevi scope of work mainly consists of constructing the piles for:<\/strong><br>\u2022 Bridges at Junction A<br>&#8211; Structure 101<br>&#8211; Structure 102<br>&#8211; Structure 103<br>\u2022 Bridges at bridge avenue (structure U301)<br>\u2022 Underpass (structure D201)<\/p>\n\n\n\n<p class=\"has-text-align-center\">For piles in junction A and bridge avenue Trevi will use&nbsp;bored piles method.<br>As for piles of the underpass, CFA method will be used.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"525\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/tabella-1024x525.jpg\" alt=\"\" class=\"wp-image-2676\" srcset=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/tabella-1024x525.jpg 1024w, https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/tabella-300x154.jpg 300w, https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/tabella-768x394.jpg 768w, https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2025\/07\/tabella.jpg 1186w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"has-text-align-center\"><strong>Trevi Group was awarded the Kuwait Univercity medical&nbsp;campus underpass piling works for Sabah Al-Salem&nbsp;university city project.<\/strong><br>The scope of works included the construction of the&nbsp;Underpass walls that contain 677 piles, \u00d8 900 mm with&nbsp;a total drilling length of 9,578 meters.<br>The main challenge was to construct 677 piles in&nbsp;60 working days, every pile have different length,&nbsp;different steel reinforcement and different COL&nbsp;with an inclined slope.<\/p>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Kuwait City, Kuwait<\/p>\n","protected":false},"featured_media":2538,"menu_order":40,"template":"","tipologia_progetto":[6],"class_list":["post-300","progetto","type-progetto","status-publish","has-post-thumbnail","hentry","tipologia_progetto-industrial-civil-buildings"],"acf":[],"_links":{"self":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/progetto\/300","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/progetto"}],"about":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/types\/progetto"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/media\/2538"}],"wp:attachment":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/media?parent=300"}],"wp:term":[{"taxonomy":"tipologia_progetto","embeddable":true,"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/tipologia_progetto?post=300"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}