{"id":3298,"date":"2026-04-10T14:58:18","date_gmt":"2026-04-10T14:58:18","guid":{"rendered":"https:\/\/trevispa.com\/en\/?post_type=progetto&#038;p=3298"},"modified":"2026-04-10T15:16:55","modified_gmt":"2026-04-10T15:16:55","slug":"mormon-island-auxiliary-dam","status":"publish","type":"progetto","link":"https:\/\/trevispa.com\/en\/progetti\/mormon-island-auxiliary-dam\/","title":{"rendered":"Mormon Island Auxiliary Dam"},"content":{"rendered":"\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h2 class=\"wp-block-heading has-text-align-center has-primary-color has-text-color has-link-color wp-elements-0da86c62466367807e49cdc23fb0077f\"><strong>2007 &#8211; Foundations Consolidation | Folsom, CA<\/strong><\/h2>\n\n\n\n<p class=\"has-text-align-center\">Mormon Island Auxiliary Dam (MIAD) is located near Sacramento, California. MIAD is an earth fill dam that is a component of the Folsom Dam, which impounds the American River to form Folsom Lake. In the 1990s, MIAD foundation was modified upstream and downstream to limit seismic deformations. Additional seismic strengthening of the MIAD foundation soils in the downstream toe area is still required. In order to treat the potentially liquefiable weak foundation soils, jet grouting was selected by the USBR as the technically preferred method to consolidate the foundations.<\/p>\n<\/div><\/div>\n\n\n<div class=\"saz-block-custom\">\n<section class=\"data-tab py-5 mt-5\">\n    <div class=\"container py-lg-4\">\n        <div class=\"row justify-content-center\">\n            <div class=\"col-lg-8\">\n                <div class=\"table-responsive\">\n                    <table class=\"table text-white\">\n                        <tbody>\n                                                            <tr>\n                                    <th scope=\"row\">Owner<\/th>\n                                    <td>US Bureau of Reclamation<\/td>\n                                <\/tr>\n                                                            <tr>\n                                    <th scope=\"row\">Contractor<\/th>\n                                    <td>TREVIICOS Corporation<\/td>\n                                <\/tr>\n                                                            <tr>\n                                    <th scope=\"row\">Engineer<\/th>\n                                    <td>USBR \u2013 Technical Service Center<\/td>\n                                <\/tr>\n                                                    <\/tbody>\n                    <\/table>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/div>\n<\/section><\/div>\n\n<div class=\"saz-block-custom\">\n<section class=\"gallery-interna\" style=\"background: url(https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1584_z_mormon_page1.jpg) center center no-repeat #353535;background-size: cover;\">\n    <div class=\"bg-grey\"><\/div>\n    <div class=\"container\">\n        <div class=\"row justify-content-center\">\n            <div class=\"col-md-12 col-lg-10\">\n                <div id=\"carouselImmagini\" class=\"carousel slide\" data-ride=\"carousel\">\n\n                    <div class=\"carousel-inner\">\n                                                    <div class=\"carousel-item active\">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1584_z_mormon_page1.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1584_z_mormon_page1.jpg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1585_z_mormon_page2.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1585_z_mormon_page2.jpg\">\n                            <\/div>\n                                            <\/div>\n                    <a class=\"carousel-control-prev\" href=\"#carouselImmagini\" role=\"button\" data-slide=\"prev\">\n                        <span class=\"fas fa-chevron-left fa-lg text-primary\" aria-hidden=\"true\"><\/span>\n                        <span class=\"sr-only\">Previous<\/span>\n                    <\/a>\n\n                    <a class=\"carousel-control-next\" href=\"#carouselImmagini\" role=\"button\" data-slide=\"next\">\n                        <span class=\"fas fa-chevron-right fa-lg text-primary\" aria-hidden=\"true\"><\/span>\n                        <span class=\"sr-only\">Next<\/span>\n                    <\/a>\n                <\/div>\n\n            <\/div>\n        <\/div>\n    <\/div>\n<\/section><\/div>\n\n\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"has-text-align-center\">In order to assess the feasibility of the jet grouting technique for the project, a full scale trial test was designed on a small portion of the dam, using different working parameters.<\/p>\n\n\n\n<p class=\"has-text-align-center\">The project, awarded to TREVIICOS for $1.4 million, consisted of 22 jet grout columns (18 triple fluid and 4 double fluid type columns). Prior to carrying out any work, 3 verification columns were conducted in accordance with the specification requirements.<\/p>\n\n\n\n<p class=\"has-text-align-center\">The jet grouting operations were divided into two stages to allow verification and adjustment of design parameters. The first phase of the work consisted of 10 triple fluid columns and 11 core holes. The second stage consisted of 8 triple fluid columns, 4 double fluid columns and 23 core holes. In accordance with the original schedule, the project was completed in three and a half months.<\/p>\n\n\n\n<p class=\"has-text-align-center\">Soilmec equipment was used for the execution of the work (i.e. Drill rigs, grouting unit and high pressure pumps).<\/p>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>2007 &#8211; Foundations Consolidation | Folsom, CA<\/p>\n","protected":false},"featured_media":3299,"menu_order":90,"template":"","tipologia_progetto":[5],"class_list":["post-3298","progetto","type-progetto","status-publish","has-post-thumbnail","hentry","tipologia_progetto-dams"],"acf":[],"_links":{"self":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/progetto\/3298","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/progetto"}],"about":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/types\/progetto"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/media\/3299"}],"wp:attachment":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/media?parent=3298"}],"wp:term":[{"taxonomy":"tipologia_progetto","embeddable":true,"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/tipologia_progetto?post=3298"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}