{"id":3363,"date":"2026-04-13T07:47:25","date_gmt":"2026-04-13T07:47:25","guid":{"rendered":"https:\/\/trevispa.com\/en\/?post_type=progetto&#038;p=3363"},"modified":"2026-04-13T07:47:25","modified_gmt":"2026-04-13T07:47:25","slug":"newark-elizabeth-rail-link","status":"publish","type":"progetto","link":"https:\/\/trevispa.com\/en\/progetti\/newark-elizabeth-rail-link\/","title":{"rendered":"Newark-Elizabeth Rail Link"},"content":{"rendered":"\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h2 class=\"wp-block-heading has-text-align-center has-primary-color has-text-color has-link-color wp-elements-5bf4fc7549d69abd70f63b17c88ed618\">2003 &#8211; Newark, NJ<\/h2>\n\n\n\n<p class=\"has-text-align-center\">The Newark Elizabeth Rail Link Contract No. 02-024, GC #1 \u2013 Tunnel is a 1-mile extension to the existing 4-mile Newark City Subway. The contract consists of the construction of an underground reinforced concrete box tunnel structure connecting two light rail transit tracks. Constructed using the cut and cover method, the new tunnel is approximately 812 feet long. The underground reinforced concrete structure is constructed under Mulberry Street from the existing subway connection at Raymond Boulevard, passing between Saint John\u2019s Church and the Episcopal House and ending at a portal about 300 feet south of Center Street.<\/p>\n<\/div><\/div>\n\n\n<div class=\"saz-block-custom\">\n<section class=\"data-tab py-5 mt-5\">\n    <div class=\"container py-lg-4\">\n        <div class=\"row justify-content-center\">\n            <div class=\"col-lg-8\">\n                <div class=\"table-responsive\">\n                    <table class=\"table text-white\">\n                        <tbody>\n                                                            <tr>\n                                    <th scope=\"row\">Owner<\/th>\n                                    <td>New Jersey Transit Corporation<\/td>\n                                <\/tr>\n                                                            <tr>\n                                    <th scope=\"row\">General Contractor<\/th>\n                                    <td>E. E. Cruz Company, Inc.<\/td>\n                                <\/tr>\n                                                            <tr>\n                                    <th scope=\"row\">Geotechnical Engineer<\/th>\n                                    <td>BRW and BPQ&amp;D, a Joint Venture<\/td>\n                                <\/tr>\n                                                            <tr>\n                                    <th scope=\"row\">Structural Engineer<\/th>\n                                    <td>DMJM Harris<\/td>\n                                <\/tr>\n                                                    <\/tbody>\n                    <\/table>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/div>\n<\/section><\/div>\n\n<div class=\"saz-block-custom\">\n<section class=\"gallery-interna\" style=\"background: url(https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1658_z_elizabeth2.jpg) center center no-repeat #353535;background-size: cover;\">\n    <div class=\"bg-grey\"><\/div>\n    <div class=\"container\">\n        <div class=\"row justify-content-center\">\n            <div class=\"col-md-12 col-lg-10\">\n                <div id=\"carouselImmagini\" class=\"carousel slide\" data-ride=\"carousel\">\n\n                    <div class=\"carousel-inner\">\n                                                    <div class=\"carousel-item active\">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1658_z_elizabeth2.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1658_z_elizabeth2.jpg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1659_z_elizabeth3.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1659_z_elizabeth3.jpg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1660_z_elizabeth4.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1660_z_elizabeth4.jpg\">\n                            <\/div>\n                                            <\/div>\n                    <a class=\"carousel-control-prev\" href=\"#carouselImmagini\" role=\"button\" data-slide=\"prev\">\n                        <span class=\"fas fa-chevron-left fa-lg text-primary\" aria-hidden=\"true\"><\/span>\n                        <span class=\"sr-only\">Previous<\/span>\n                    <\/a>\n\n                    <a class=\"carousel-control-next\" href=\"#carouselImmagini\" role=\"button\" data-slide=\"next\">\n                        <span class=\"fas fa-chevron-right fa-lg text-primary\" aria-hidden=\"true\"><\/span>\n                        <span class=\"sr-only\">Next<\/span>\n                    <\/a>\n                <\/div>\n\n            <\/div>\n        <\/div>\n    <\/div>\n<\/section><\/div>\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"has-text-align-center\">The general contractor was required to design and install the temporary support of excavation for the cut and cover tunnel. A temporary support of excavation comprising soldier piles and lagging, in addition to secant pile wall along the existing Episcopal House and the existing parking garage, was selected.<\/p>\n\n\n\n<p class=\"has-text-align-center\">The secant pile walls were designed by Mueser Rutledge Consulting Engineers. Soldier piles, W24 x 117, were installed in all secondary piles immediately after concreting.<\/p>\n\n\n\n<p class=\"has-text-align-center\">Prior to the secant pile wall construction, TREVIICOS installed concrete guidewalls. The purpose of the guidewalls are to provide permanent alignment, guide for the drilling tool at the surface and support the upper portion of soil immediately adjacent to the excavation.<\/p>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>2003 &#8211; Newark, NJ<\/p>\n","protected":false},"featured_media":3364,"menu_order":70,"template":"","tipologia_progetto":[29],"class_list":["post-3363","progetto","type-progetto","status-publish","has-post-thumbnail","hentry","tipologia_progetto-retention-systems"],"acf":[],"_links":{"self":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/progetto\/3363","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/progetto"}],"about":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/types\/progetto"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/media\/3364"}],"wp:attachment":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/media?parent=3363"}],"wp:term":[{"taxonomy":"tipologia_progetto","embeddable":true,"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/tipologia_progetto?post=3363"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}