{"id":3373,"date":"2026-04-13T08:20:40","date_gmt":"2026-04-13T08:20:40","guid":{"rendered":"https:\/\/trevispa.com\/en\/?post_type=progetto&#038;p=3373"},"modified":"2026-04-13T08:21:14","modified_gmt":"2026-04-13T08:21:14","slug":"first-street-tunnel","status":"publish","type":"progetto","link":"https:\/\/trevispa.com\/en\/progetti\/first-street-tunnel\/","title":{"rendered":"First Street Tunnel"},"content":{"rendered":"\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h2 class=\"wp-block-heading has-text-align-center has-primary-color has-text-color has-link-color wp-elements-35c9c59779c6aed9ba19cd0856b19b4b\"><strong>2014 &#8211; Washington, D.C.<\/strong><\/h2>\n\n\n\n<p class=\"has-text-align-center\">The project site is located on First Street NW across from McMillan Reservoir in Washington, D.C. The purpose of this project is to provide support of excavation for the Channing Street Mining Shaft, which will be an entry point for a tunnel boring machine. The work consisted of the construction of a reinforced concrete slurry wall shaft that will allow a tunnel boring machine to be lowered 150ft into the excavation, in conjunction with cement-bentonite cutoff wall to limit water infiltration at the head of the underground tunnel to begin the tunnel mining process. Once complete, the tunnel will increase storm water discharge capacity for neighborhoods north of Capitol Hill.<\/p>\n<\/div><\/div>\n\n\n<div class=\"saz-block-custom\">\n<section class=\"data-tab py-5 mt-5\">\n    <div class=\"container py-lg-4\">\n        <div class=\"row justify-content-center\">\n            <div class=\"col-lg-8\">\n                <div class=\"table-responsive\">\n                    <table class=\"table text-white\">\n                        <tbody>\n                                                            <tr>\n                                    <th scope=\"row\">Owner<\/th>\n                                    <td>DC Water and Sewer Authority<\/td>\n                                <\/tr>\n                                                            <tr>\n                                    <th scope=\"row\">Design Builder and Construction Manager<\/th>\n                                    <td>Skanska-Jay Dee Joint Venture<\/td>\n                                <\/tr>\n                                                            <tr>\n                                    <th scope=\"row\">Geotechnical Engineer<\/th>\n                                    <td>Parsons Brinckerhoff<\/td>\n                                <\/tr>\n                                                            <tr>\n                                    <th scope=\"row\">Structural Engineer<\/th>\n                                    <td>Parsons Brinckerhoff<\/td>\n                                <\/tr>\n                                                    <\/tbody>\n                    <\/table>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/div>\n<\/section><\/div>\n\n<div class=\"saz-block-custom\">\n<section class=\"gallery-interna\" style=\"background: url(https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1671_z_first1.jpg) center center no-repeat #353535;background-size: cover;\">\n    <div class=\"bg-grey\"><\/div>\n    <div class=\"container\">\n        <div class=\"row justify-content-center\">\n            <div class=\"col-md-12 col-lg-10\">\n                <div id=\"carouselImmagini\" class=\"carousel slide\" data-ride=\"carousel\">\n\n                    <div class=\"carousel-inner\">\n                                                    <div class=\"carousel-item active\">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1671_z_first1.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1671_z_first1.jpg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1672_z_first2.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1672_z_first2.jpg\">\n                            <\/div>\n                                                    <div class=\"carousel-item \">\n                                <img decoding=\"async\" src=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1673_z_main3.jpg\" class=\"img-fluid d-block w-100 mb-2\" data-bg=\"https:\/\/trevispa.com\/en\/wp-content\/uploads\/sites\/3\/2026\/04\/1673_z_main3.jpg\">\n                            <\/div>\n                                            <\/div>\n                    <a class=\"carousel-control-prev\" href=\"#carouselImmagini\" role=\"button\" data-slide=\"prev\">\n                        <span class=\"fas fa-chevron-left fa-lg text-primary\" aria-hidden=\"true\"><\/span>\n                        <span class=\"sr-only\">Previous<\/span>\n                    <\/a>\n\n                    <a class=\"carousel-control-next\" href=\"#carouselImmagini\" role=\"button\" data-slide=\"next\">\n                        <span class=\"fas fa-chevron-right fa-lg text-primary\" aria-hidden=\"true\"><\/span>\n                        <span class=\"sr-only\">Next<\/span>\n                    <\/a>\n                <\/div>\n\n            <\/div>\n        <\/div>\n    <\/div>\n<\/section><\/div>\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"has-text-align-center\">The slurry wall was constructed using the tremie concrete method, with thickness of 42\u201d to provide adequate strength to retain soil during mass excavation. It used over 200 tons of both steel and GFRP (Glass Fiber Reinforced Plastic) bars, and 6000 cubic yards of concrete.<\/p>\n\n\n\n<p class=\"has-text-align-center\">The slurry wall was constructed with various \u201csoft eyes\u201d where the tunnel boring machine will bore through to begin tunnel excavation. GFRP bars were used in place of traditional black steel at pre-determined locations to accommodate slurry wall opening requirements for the tunnel boring machine.<\/p>\n\n\n\n<p class=\"has-text-align-center\">Due to the depth required for this project, maintaining verticality of excavation is the most important aspect for a quality product, as such multiple technologies were used to monitor the deviations of the panel.<\/p>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>2014 &#8211; Washington, D.C.<\/p>\n","protected":false},"featured_media":3374,"menu_order":0,"template":"","tipologia_progetto":[30],"class_list":["post-3373","progetto","type-progetto","status-publish","has-post-thumbnail","hentry","tipologia_progetto-foundation-elements"],"acf":[],"_links":{"self":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/progetto\/3373","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/progetto"}],"about":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/types\/progetto"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/media\/3374"}],"wp:attachment":[{"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/media?parent=3373"}],"wp:term":[{"taxonomy":"tipologia_progetto","embeddable":true,"href":"https:\/\/trevispa.com\/en\/wp-json\/wp\/v2\/tipologia_progetto?post=3373"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}