{"id":1763,"date":"2017-09-21T00:00:00","date_gmt":"2017-09-21T00:00:00","guid":{"rendered":"https:\/\/trevistg.wpenginepowered.com\/es\/2017\/09\/21\/trevi-para-icd-tower-en-dubai\/"},"modified":"2017-09-21T00:00:00","modified_gmt":"2017-09-21T00:00:00","slug":"trevi-para-icd-tower-en-dubai","status":"publish","type":"post","link":"https:\/\/trevispa.com\/es\/2017\/09\/21\/trevi-para-icd-tower-en-dubai\/","title":{"rendered":"TREVI PARA ICD TOWER EN DUBAI"},"content":{"rendered":"<p>Swissboring,&nbsp;Sucursal de Trevi en los Emiratos Arabes Unidos, ha realizado las fundaciones para la nueva ICD Tower ubicada en el Dubai Financial Centre. Swissboring acaba de completar los trabajos de fundaci\u00f3n para la nueva ICD Tower, 54 pisos, 282 metros de altitud, proyectada por la Sociedad inglesa Foster+Partners.<\/p>\n<p>El proyecto, denominado ICD Brookfield Place, se ha realizado en el Dubai Financial Centre, comisionado por la Joint Venture entre Investment Corporation de Dubai (ICD) y Brookfield Property Partners. Es el primer proyecto importante que se est\u00e1 llevando a cabo en el Dubai Financial Centre desde el comienzo de la crisis financiera de 2008. El masterplan firmado por Foster+Partners prev\u00e9 una torre de 53 pisos, que consta de m\u00e1s de 900.000 m2 de oficinas prestigiosas, un centro comercial de 150.000 m2 con tiendas, restaurantes, un centro de fitness y otras estructuras. Tres suites lujosas con vistas, ubicadas en la parte superior de la torre, disponen de m\u00faltiples terrazas y de un jard\u00edn abierto con vistas al famoso edificio Burj Khalifa.<\/p>\n<p>Los trabajos de Swissboring empezaron a mediados de Marzo de 2016; el proyecto deber\u00eda durar aproximadamente 18 meses. Gracias al uso de equipos &nbsp;Soilmec&nbsp; se han construido&nbsp;12.000 m\u00b2 de pantallas, 850 pilotes con di\u00e1metro comprendido entre 1.000 y 1.500 mm, y m\u00e1s de 2.000 anclajes que soportan la pantalla. El proyecto ICD Brookfield Place en su conjunto ser\u00e1 finalizado seg\u00fan se prev\u00e9 a finales de 2018.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Swissboring, Sucursal de Trevi en los Emiratos Arabes Unidos, ha realizado las fundaciones para la nueva ICD Tower ubicada en el Dubai Financial Centre.<\/p>\n","protected":false},"author":3,"featured_media":1560,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[13],"tags":[],"class_list":["post-1763","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"featured_image_src":"https:\/\/trevispa.com\/es\/wp-content\/uploads\/sites\/4\/2025\/07\/3037_n_main-600x400.jpg","featured_image_src_square":"https:\/\/trevispa.com\/es\/wp-content\/uploads\/sites\/4\/2025\/07\/3037_n_main-600x480.jpg","author_info":{"display_name":"Matteo Sertori","author_link":"https:\/\/trevispa.com\/es\/author\/msertori\/"},"acf":[],"_links":{"self":[{"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/posts\/1763","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/comments?post=1763"}],"version-history":[{"count":0,"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/posts\/1763\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/media\/1560"}],"wp:attachment":[{"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/media?parent=1763"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/categories?post=1763"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/tags?post=1763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}