{"id":2260,"date":"2025-03-15T00:00:00","date_gmt":"2025-03-15T00:00:00","guid":{"rendered":"https:\/\/trevistg.wpenginepowered.com\/es\/2025\/03\/15\/secant-piles-technology-for-the-cutoff-wall-installation-part-of-the-boone-dam-internal-erosion-remediation-project\/"},"modified":"2025-07-31T09:54:47","modified_gmt":"2025-07-31T09:54:47","slug":"secant-piles-technology-for-the-cutoff-wall-installation-part-of-the-boone-dam-internal-erosion-remediation-project","status":"publish","type":"post","link":"https:\/\/trevispa.com\/es\/2025\/03\/15\/secant-piles-technology-for-the-cutoff-wall-installation-part-of-the-boone-dam-internal-erosion-remediation-project\/","title":{"rendered":"Secant piles technology for the cutoff wall installation, part of the Boone Dam Internal Erosion Remediation Project"},"content":{"rendered":"<p><strong>For&nbsp;the&nbsp;cutoff wall installation, part of the&nbsp;Boone Dam Internal Erosion Remediation Project, the&nbsp;Treviicos-Nicholson&nbsp;Joint Venture&nbsp;selected&nbsp;the secant piles&nbsp;technology as the most appropriate and safest methodology to address all the dam safety requirements<\/strong>.&nbsp;<\/p>\n<p>The Secant Pile was installed maintaining&nbsp;a&nbsp;strict alignment and overlap requirements while penetrating through a challenging mixture of soil and highly weathered rock within the upper portions of the dam\u2019s foundation. The cutoff is keyed into the sloping face of the existing concrete dam, forming a continuous composite seepage barrier along the entire alignment of the earthen dam. Over 300&nbsp;secant piles&nbsp;were installed to create 850-ft long secant pile barrier, totaling 113,000 square feet of cutoff wall, and&nbsp;approximately&nbsp;27,000 cubic yards of concrete.&nbsp;<\/p>\n<p><strong>Verification of the verticality, embedment and concrete quality of each element forming the wall was critical.&nbsp;&nbsp;<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>For&nbsp;the&nbsp;cutoff wall installation, part of the&nbsp;Boone Dam Internal Erosion Remediation Project, the&nbsp;Treviicos-Nicholson&nbsp;Joint Venture&nbsp;selected&nbsp;the secant piles&nbsp;technology as the most appropriate and safest methodology to address all the dam safety requirements.&nbsp; The Secant Pile was installed maintaining&nbsp;a&nbsp;strict alignment and overlap requirements while penetrating through a challenging mixture of soil and highly weathered rock within the upper portions [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2261,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[12],"tags":[],"class_list":["post-2260","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mainprojectnews"],"featured_image_src":"https:\/\/trevispa.com\/es\/wp-content\/uploads\/sites\/4\/2025\/07\/4010_n_POIO9527-600x400.jpg","featured_image_src_square":"https:\/\/trevispa.com\/es\/wp-content\/uploads\/sites\/4\/2025\/07\/4010_n_POIO9527-600x600.jpg","author_info":{"display_name":"Matteo Sertori","author_link":"https:\/\/trevispa.com\/es\/author\/msertori\/"},"acf":[],"_links":{"self":[{"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/posts\/2260","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/comments?post=2260"}],"version-history":[{"count":0,"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/posts\/2260\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/media\/2261"}],"wp:attachment":[{"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/media?parent=2260"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/categories?post=2260"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trevispa.com\/es\/wp-json\/wp\/v2\/tags?post=2260"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}