2016 – Dubai, U.A.E.
Project located on the Sh. Zaid Road Dubai, with an investment of 1.77 billion AED, it includes drilling the water canal, constructing sides of the canal, three footbridges which will link the two backs of the canal, in addition to the construction of four marine transit stations to boost the role of marine transport.
| Owner | Gov. Dubai – Rta |
|---|---|
| Consultant | Parson and Halcrow |
| Main Contractor | Besix Llc |
| Qty | 128 bored piles |
| Size | ø 1000 and 1500 mm |
English
Italiano
Español