Vai direttamente al contenuto della pagina.
English
  • Italiano
  • English
  • Español
  • Trevi Group
  • Main Project News
  • Careers
  • Suppliers
  • Accessibility Statement
Whistleblowing/Segnalazioni
  • Italiano Italiano
    • IT – Policy del Gruppo Trevi
    • IT – Procedura operativa
    • IT – Segnalazioni tramite Lettera/Email
    • Whistleblowing
  • English English
    • EN – Trevi Group Policy
    • EN – Operating Procedure
    • EN – Reporting by Letter/Email
    • Whistleblowing
  • Espanol Espanol
    • ES – Politica del Grupo Policy
    • ES – Procedimiento Operativo
    • ES – Informes por Carta/Correo
    • Whistleblowing
Trevi SpA (EN)
  • Expertise
  • Sustainability
  • Services
  • Technologies
  • Projects
    • Main Projects
    • Projects Archive
    • EU-Funded Projects
  • Media
  • Company
    • Headquarters
    • Trevi Algerie
    • Trevi Australia
    • Trevi Foundations Kuwait
    • Trevi Foundations Nigeria
    • Trevi Philippines
    • Pilotes Trevi
    • Trevi Turkey
  • Contact us
    • Contact us
    • Network
    • FTA Academy
  • Trevi Group
  • Main Project News
  • Careers
  • Suppliers
  • Accessibility Statement

Press enter to search or escape to exit

Home / Media Gallery / NEW EASTERN DOCK PROJECT AT PORT OF NAPLES
Submenu
  • Arena Santa Giulia
  • Arena Santa Giulia - Teaser
  • TREVI for Caviro in a new bottling wine facility
  • HS BRESCIA VERONA - THE LONATO GALLERY - MASTERING THE TASK
  • CHACAO BRIDGE PROJECT - PILA SUR - MASTERING THE TASK
  • CHACAO BRIDGE PROJECT - PILA NORTE - MASTERING THE TASK
  • OUR METRO & MRT - Emblematic structures built by Trevi Group
  • OUR DAMS - Emblematic structures built by Trevi Group
  • E-JET - Putting the jet grouting into elliptical shape
  • SKYWAY STAGE 3 - TREVI FOUNDATIONS PHILIPPINES
  • OUR BRIDGE - Emblematic structures built by Trevi Group
  • GRAND PARIS EXPRESS - MASTERING THE TASK
  • WORKING ACTIVITIES FOR ROME METRO C LINE - MASTERING THE TASK
  • CHACAO BRIDGE PROJECT - PILA CENTRAL - MASTERING THE TASK
  • FOUR FRANKFURT - MASTERING THE TASK
  • FOUR FRANKFURT - FEEL THE EMOTIONS
  • CEBU - CORDOVA LINK EXPRESSWAY PROJECT: MASTERING THE TASK
  • LIQUEFACTION A TREVI TEST FIELD IN PIEVE DI CENTO
  • MAINTENANCE GROUTING AND REHABILITATION OF THE BOTTOM OUTLET TUNNELS
  • 60 YEARS OF THE TREVI GROUP
  • RESTORATION OF LUNGARNO TORRIGIANI EMBANKMENT
  • ROME METRO LINE C PROJECT
  • COPENHAGEN CITYRINGEN METRO LINE PROJECT
  • MANFREDONIA LANDFILL CLEANUP AND RECLAMATION
  • DEEP SOIL MIXING HELPS RESTORE SAN MARCO BELL TOWER IN VENICE
  • HYDROMILL TECHNOLOGY FOR THE NEW MILLENNIUM
  • ARCISATE-STABIO RAILWAY PROJECT
  • STANS H-3 TUNNEL (AUSTRIA)
  • NEW ORLEANS EAST BACK LEVEE LPV-111 IMPROVEMENT

NEW EASTERN DOCK PROJECT AT PORT OF NAPLES

Trevi worked at the “Darsena di Levante” Eastern Dock in the port of Naples to the design and realization of a new container terminal, a wide area created by filling the body of water between the two piers. From an operational point of view, the project has to face major environmental and construction challenges, due both to the position on the sea and the environmental requirements to be met. A cofferdam structure has to be constructed to the seaward and the landward side, which requires the use of some of the most cutting-edge technologies and materials existing today, from sheet piling to the consolidation of the seabed level, from low impact concreting plants to fibreglass pipes and special cements.

Follow Us
  • x
  • issuu
  • Expertise
  • Technologies
  • Services
  • News
  • Events
  • Press Review
  • About us
  • Controls & Risks
  • Contact us
  • Network
  • Careers
  • FTA – Academy
© TREVI - Finanziaria Industriale SpA - P.IVA: 00002890408
  • Cookie Policy
  • Privacy Policy
  • Sitemap
  • Accessibility Statement