LIQUEFACT - PIEVE DI CENTO 
LIQUEFACT - PIEVE DI CENTO 

LIQUEFACT - TREVI ROLE

24 Jul 2019

TREVI’s know-how was crucial to the implementation of trials whose final goal was the full-scale testing of the two selected technologies:

  1. Induced partial saturation by pumping air trhough horizontal well screens.
  2. Horizontal drains.

The place chosen to carry out the tests is in the municipality of Pieve di Cento, close by the Reno River. The area is characterised by shallow sandy deposits that were strongly affected by liquefaction during the earthquake in Emilia, in 2012.
An artificial quake was generated to induce high pore pressure in the soil; the same operation was carried out in three different areas:

  • In virgin soil
  • Where horizontal drains were installed
  • Where pipes were installed for the induced partial saturation

Many transducers were also installed in the soil such as geophones for vibrations and pressure transducers, with the aim of comparing the data collected from the three different areas.

}