2016 – Abu Dhabi, U.A.E.
The project consists of offshore works which is include the expansion of Ruwais LNG terminal with unloading platform and mooring dolphin.
| Owner | Abu Dhabi Gas Industries Ltd. |
|---|---|
| Consultant | Cowi |
| Main Contractor | Excelerate and Target Engineering |
| Qty | 26 vertical piles and 6 rake piles |
| Size | ø 900 and 1200 mm |
English
Italiano
Español