Vai direttamente al contenuto della pagina.
Español
  • Italiano
  • English
  • Español
  • Trevi Group
  • Main Project News
  • Careers
  • Suppliers
Whistleblowing/Segnalazioni
  • Italiano Italiano
    • IT – Policy del Gruppo Trevi
    • IT – Procedura operativa
    • IT – Segnalazioni tramite Lettera/Email
    • Whistleblowing
  • English English
    • EN – Trevi Group Policy
    • EN – Operating Procedure
    • EN – Reporting by Letter/Email
    • Whistleblowing
  • Espanol Espanol
    • ES – Politica del Grupo Policy
    • ES – Procedimiento Operativo
    • ES – Informes por Carta/Correo
    • Whistleblowing
Trevi SpA (ES)
  • Experiencia
  • Sustainability
  • Servicios
  • Tecnologías
  • Proyectos
    • Principales Proyectos
    • Archivo de Proyectos
    • Proyectos Financiados por la UE
  • Empresa
    • Headquarters
    • Trevi Algerie
    • Trevi Australia
    • Trevi Philippines
    • Trevi Foundations Kuwait
    • Trevi Foundations Nigeria
    • Pilotes Trevi
    • Trevi Cimentaciones Mexico
    • Trevi Turkey
    • Trevi France
  • Contáctenos
    • CONTACTOS
    • Red Mundial
    • FTA Academy
  • Trevi Group
  • Main Project News
  • Careers
  • Suppliers

Presione enter para buscar o escape para salir

Home / Media Gallery / NEW ORLEANS EAST BACK LEVEE LPV-111 IMPROVEMENT
Submenu
  • Arena Santa Giulia
  • Arena Santa Giulia - Teaser
  • TREVI para Caviro en una nueva planta de embotellado de vinos
  • HS BRESCIA VERONA - THE LONATO GALLERY - MASTERING THE TASK
  • CHACAO BRIDGE PROJECT - PILA SUR - MASTERING THE TASK
  • CHACAO BRIDGE PROJECT - PILA NORTE - MASTERING THE TASK
  • OUR METRO & MRT - Emblematic structures built by Trevi Group
  • OUR DAMS - Emblematic structures built by Trevi Group
  • E-JET - Putting the jet grouting into elliptical shape
  • SKYWAY STAGE 3 - TREVI FOUNDATIONS PHILIPPINES
  • OUR BRIDGE - Emblematic structures built by Trevi Group
  • GRAND PARIS EXPRESS - MASTERING THE TASK
  • WORKING ACTIVITIES FOR ROME METRO C LINE - MASTERING THE TASK
  • CHACAO BRIDGE PROJECT - PILA CENTRAL - MASTERING THE TASK
  • FOUR FRANKFURT - MASTERING THE TASK
  • FOUR FRANKFURT - FEEL THE EMOTIONS
  • CEBU - CORDOVA LINK EXPRESSWAY PROJECT: MASTERING THE TASK
  • LIQUEFACTION A TREVI TEST FIELD IN PIEVE DI CENTO
  • MAINTENANCE GROUTING AND REHABILITATION OF THE BOTTOM OUTLET TUNNELS
  • 60 YEARS OF THE TREVI GROUP
  • RIPRISTINO LUNGARNO TORRIGIANI A FIRENZE
  • LINEA C DELLA METROPOLITANA DI ROMA
  • NUOVO TERMINAL CONTAINER DEL PORTO DI NAPOLI
  • COPENHAGEN CITYRINGEN METRO LINE PROJECT
  • MESSA IN SICUREZZA DELLA DISCARICA DI MANFREDONIA
  • NUOVO RECORD DI PROFONDITÀ CON IDROFRESA (-250 METRI)
  • DEEP SOIL MIXING HELPS RESTORE SAN MARCO BELL TOWER IN VENICE
  • CANTIERE DI ARCISATE
  • TUNNEL H-3 STANS (AUSTRIA)

NEW ORLEANS EAST BACK LEVEE LPV-111 IMPROVEMENT

The LPV111 East Back Levee Improvement Project is located along the Gulf Intracoastal Waterway in Orleans Parish of New Orleans and it is an essential component of the New Orleans Hurricane Protection System. The existing levee sections suffered extensive damages from Hurricane Katrina, such that the US Army Corps of Engineers elected to provide earth stabilization and rebuild the levee sections as part of the Greater New Orleans Hurricane Storm Damage Risk Reduction System.

Due to the adverse geotechnical properties of the foundation soils, wet Deep Mixing Method (DMM) was selected to stabilize the existing ground conditions ahead of the new levee installation.

Síguenos en
  • x
  • issuu
  • Expertise
  • Technologies
  • Services
  • Events
  • Reseña de Prensa
  • About us
  • Controls & Risks
  • Contact Us
  • Network
  • Careers
  • FTA – Academy
© TREVI - Finanziaria Industriale SpA - P.IVA: 00002890408
  • Cookie Policy
  • Privicidad
  • Site map
  • Declaración de accesibilidad