03 enero 2017 –
Bridge aross the Tagliamento river – A4 Higway – New 3rd line
Fossalta-Gonars (VE), Italy (2017-2018)
02 enero 2017 –
KNPC – Al Zour – New refinery project – Administration Buildings
Al Zour, Kuwait (2017)
04 enero 2002 –
Messa in sicurezza della falda e ripristino della barriera di contenimento
Raffineria Agip – Gela
05 enero 1999 –
Bonifica area contaminata da solventi clorurati – Ex discarica di Avigliana
Avigliana (TO), Italy (1999)
04 enero 1999 –
Permeable zerovalent-iron reactive barrier for the reclamation of an area contaminated by chlorinated solvents
Avigliana, Turín
Español
Italiano
English